Back from C4 – R2 Lives!
I’m back from C4 and R2 performed really well.
I was able to finish the basic structure, the dome, the electronics and he was fully RC’d and running around most all of the days at the con. As you can see I also fixed the dome and got most of the blue painting done. Battery life was excellent and the Roboteq AX3500 speed controller / NPC-2212 combo worked out great. I was in both races and the little guy far exceeded my expectations of what I thought I’d be able to do at C4.
This is me driving back to the hotel on the last evening ready for transport back to the Bay Area – Yes I drove him home 1/2 mile to the hotel without incident.
I still need to sort through my photos and upload them and post a full write-up, but wanted to post something other than having my dented dome as the top post in the blog 🙂
I also intend on going back and catch up with blog posts on all the building I did before I left.
Posted by Chris on June 1st, 2007 in Events, General | Comments Off on Back from C4 – R2 Lives!
Tags: batteries, C4, Celebration 4, R2D2 Mailbox, roboteq, speed controller